It is important that before starting the procedure of installing a split-type air conditioner, some items are checked:
- Is the equipment capacity adequate?
- Have the units been damaged in transport or storage?
- Are the evaporator and condenser units compatible?
- Is the necessary voltage to the equipment available?
- Is there a forecast for drain output?