High-pressure built-in type evaporator unit installation

 Installation of suspension rods with 10mm diameter

• Leave a space between the suspension rods according to the dimensions shown in the manufacturers' manuals.

• Use suspension rods 10mm in diameter (placed in place)

• After suspending the unit, carry out the work of connecting the piping and wiring inside the ceiling.

After selecting the location where the unit is to be installed and determining the direction in which the pipes should pass, route the refrigerant pipes, the drain, the remote control wiring for the indoor / outdoor unit and the remote control wire to the places where they will be connected, before suspending the unit, especially where the roof already exists.


Hanging the evaporator unit

1. Suspend the unit in line with the suspension rods.

2. Tighten the nuts to secure the unit.

Make sure the unit is level.

If it is suspended at an angle, the drain receptacle may leak.

Install the unit according to the dimensions indicated by the manufacturer.

Use a leveler to ensure that the unit is level.