Verification after the end of all electrical work
1. While the cooling operation is active, remove the rubber bearing from the water opening cover, according to the manufacturer, and with a water pump or other source add water gradually (at least between 600 and 800cc) through the opening. water supply. Check the draining action of the system by listening to the sound of the drain pump.
If the sound of the drain pump changes from continuous to intermittent, the drain system is functioning normally.
2. After checking the system, reinstall the rubber bearing in the water supply opening and attach the supplied circular insulator to the bearing.