Check all the received volumes, checking if they are in accordance with the invoice of remittance. Remove the packaging from the unit after reaching the final installation location and remove all protective covers. Avoid destroying the packaging, as it may eventually serve to cover the device, protecting it from dust, etc., until the work and / or installation is complete and the system is ready for operation. If the unit has been damaged, notify the carrier immediately.
- Check that the power supply of the location is in accordance with the electrical characteristics of the equipment, as specified on the unit identification label.
- To maintain the warranty, avoid that the heat exchanger, ventilation modules are exposed to the weather or to accidents at work, providing their immediate transport to the installation site or another safe place.