Start-up checklist right after installing the split air conditioner

 Check that the refrigerant and electrical connections are correct

Check that no foreign bodies or tools are on or under equipment.

Check for possible leaks in connections

Check that the lines are well fixed and insulated

Check that the passages through the piping structures are well sealed

Check that the water drains are free

Free and unobstructed supply and return grilles

The air filters are installed and clean.

Check with a calibrated thermometer that the temperature control is accurate.

Check grounding

Check supply voltage, amp ratings of fuses and circuit breakers.

Check that the wires are compatible with the electrical load.

Check that the electrical connections are tight.

Check that the refrigerant pipes do not touch the electrical wiring.

The compressor housing was heated for at least 12 hours.

 Check that the batteries in the remote control are charged.