Lifting and handling of air conditioning mini-central

 The equipment packaging must be maintained during transport and transportation and removed only at the installation, in order to protect it.

Before moving the equipment, check that the lifting device supports the weight of the section to be lifted.

For transportation with a forklift, attention must be paid to the positioning of the fork to ensure that it is in the center of gravity of the section to be transported and, consequently, to provide a balanced and safe condition in the transport.

For lifting, appropriate straps with a capacity equal to or greater than the weight of the equipment must be used. The strap should be placed under the pallet, and above the equipment, spacers should be placed to prevent the strap from being in contact with the section.