The single-phase zombie compressor continues, but does not break the overload protector intervenes I

Line voltage below the tolerance limits.
Measure the voltage at the meter output: If it is below the tolerance limits, require the intervention of the electricity supply company. If, on the contrary, the voltages are at the limits, check if there was a voltage drop at the compressor input when the compressor zooms, but does not start. If there is a voltage drop, the line is shown to be of insufficient section. Replace the line with another of a suitable section. If the insufficient voltage is not due to the internal line and if the decrease is not temporary, the torque can be increased.
compressor start (if this is the PSC type) by installing a set comprising a starting capacitor and a relay, thus transforming the starting system of the PSC compressor to CRS.