After assembling the pipes, perform the leak test to check that there are no leaks:
- Connect the central hose of the manifold which is yellow in the nitrogen cylinder with the valves closed;
- Pressurize the suction line with 200 to 250 PSI;
- Check all connections. If there is no leak, open the manifold valve and release nitrogen from the line.